Business content

Environmental energy

Environment

"Cutting-edge technology"
and "experience cultivated over many years and abundant achievements"

Based on "state-of-the-art technology" and "experience cultivated over many years and a wealth of achievements", we strive to improve reliability and quality, and support the environmental energy business that creates a clean and beautiful future life.

Construction management (CM) business

Construction Management is the act of neutrally adjusting the overall structure of a construction project by a construction manager (CMr) who has received a quasi-delegation from the construction client to ensure smooth progress toward the achievement of the project's objectives.
All of our employees have a CM guidebook, and we will supervise construction in accordance with the client's intentions, making use of our experience as well as basic knowledge.
There are two types of CM services: the "at-risk CM method", in which construction contracts are ordered in addition to CM services, and the "pure CM method," in which the CMr performs management tasks without taking on construction-related risks.

  • At-Risk CM method
    At-Risk CM method
  • Pure CM method
    Pure CM method

Survey / survey / design

On-site inspection

  • On-site inspection

    Expected effect
  • Simple compaction survey

    Simple compaction survey

License investigation

  • Hearing survey of government, river administrators, etc.

Report writing

  • Site photo

  • Sunlight suitability determination

  • List of required permits and licenses

    • Forest land development permit application (Forest Law)
    • Notification based on the National Land Use Planning Act (National Land Use Planning Act)
    • Notification based on the Soil Contamination Countermeasures Act (Soil Contamination Countermeasures Act)
    • River consultation pertaining to development activities
    • Non-statutory public property occupation permission application
    • Agricultural land diversion permission application (Agricultural land law)
    • Notification of civil engineering work, etc. in the land containing buried cultural properties
    • Application for permission to act in a landslide prevention area
      (Landslide Prevention Law)
    • Notification of actions within the landscape planning area (prefectural landscape ordinances, etc.)

Steep slope construction

Our company has a reputation for civil engineering work that utilizes the knowledge and experience we have accumulated over 50 years, and we have a track record of construction on steep slopes where heavy machinery cannot enter, and on slopes of 30 degrees or more. Therefore, it is possible to construct a solar power plant and propose the optimal construction method for the terrain.

On-site inspection

  • On-site inspection

    On-site inspection

    First of all, we will conduct a site survey and create an optimal construction plan according to the environment.

  • Temporary stage

    Temporary stage

    A temporary stage will be set up to ensure safety management and material storage.

  • Erosion control embankment improvement

    Material delivery

    We select materials suitable for slopes and carry in materials according to the process.

Construction

We will make the most effective use of the site according to the topography and carry out the construction of the solar power plant.

  • Construction

3D design work

3D construction management

In the midst of large-scale construction work such as construction of a new mega solar power plant, we are working to enable accurate and efficient management by utilizing 3D space. For construction sites on steep slopes or sites with a wide development range, point cloud data obtained by drone surveying can be used to visually express the construction situation in 3D even at sites where it is difficult to grasp the construction status. In addition, using a 3D model, it is possible to collect information on the progress of the site from various perspectives, and it can be used as an explanation material for construction simulations and construction plans as one of the site management tools.

  • 3D construction management ①
  • 3D construction management ①
  • Merit ① Reduction of man-made risk

    As the scope of development becomes larger, the task of visualizing the on-site progress in a concrete manner takes more time, and there is a risk of human error in calculations. The 3D point cloud processing system utilizes the mesh method (height method) that corresponds to quantity calculation from the measured point cloud data and the soil volume calculation (prismoidal method) using a triangular network, so that the progress can be confirmed. It reduces the risk of human factors while increasing efficiency.

  • Merit ② Sharing of completed image

    By integrating the surveyed point cloud data and the design model using various drawing data, we can "visualize" changes in the site accompanying construction and comparison with the design in 3D. Specifically, by showing the calculation of the amount of soil transported during construction and the interference check with the structure on the drawing, the completion image can be shared between the ordering party and the subcontractor, and various construction simulation can be realized.

EPC centralized control system

We consistently provide everything from construction work to EPC work.
*EPC (Engineering/Procurement/Construction): Refers to the following three basic processes for plant construction

E / Engineering

We plan construction plans, make estimates, design, select components, and simulate income and expenditure.At the same time, we also conduct preliminary surveys of the installation environment and apply for consultations with related organizations.

P / Procurement

We select manufacturers of equipment and materials to be incorporated into the system and procure materials. We also carry out quality control of procured parts.

C / Construction

At the actual construction stage, we perform on-site management and process management such as site surveys, installation work, and electrical work.